Views: 0 Author: Site Editor Publish Time: 2026-02-03 Origin: Site
| Aspect | Previous Requirements | 2026 New Requirements |
|---|---|---|
| Primary Responsibility | Shared responsibility | Clear construction unit primary responsibility |
| Digital Oversight | Limited reporting | Mandatory Smart Site platform integration |
| BIM Application | Recommended | Compulsory BIM forward design for projects >50,000 m² or ¥500M investment |
| Green Construction | Voluntary | Mandatory two-star green building rating |
| Penalty Structure | Maximum ¥500,000 | Enhanced penalties up to ¥2 million + lifelong industry bans |
BIM Mandate: Government projects >¥50M and enterprise projects >¥200M
Green Building: Civil buildings ≥ two-star; public buildings ≥ three-star
Digital Integration: Real-time data upload covering personnel, materials, equipment, environment
Clear Accountability: Distributed responsibility led to enforcement challenges
Digital Integration: Paper-based systems created information silos
Mandatory Sustainability: Voluntary green standards resulted in inconsistent adoption
Predictive Risk Management: Reactive approaches limited hazard prevention
Real-time personnel tracking through biometric authentication
Material traceability with QR code/RFID technology
Environmental monitoring for PM10 (≤0.15mg/m³), noise (≤70dB), wastewater (≥95% compliance)
Complete architectural, structural, and MEP modeling with clash detection
4D scheduling integration and progress simulation
Asset information transfer to facility management systems
Low embodied carbon (<300 kg CO₂e/m³ for concrete)
High recycled content (≥30% for aggregates)
Certified environmental performance
Zirconium oxide content ≥18%
Alkali resistance retention ≥85% after 28-day immersion
Tensile strength: 3,500 N/50mm longitudinal
Recycled PVC content up to 40%
Zero VOC emissions verified
25+ year service life
Conduct Regulatory Gap Analysis: Review projects against new requirements
Invest in Digital Infrastructure: Implement Smart Site platforms, train BIM specialists
Revise Material Procurement: Update specifications with green building criteria
Develop Documentation Systems: Create digital archives, implement verification protocols
Differentiate through compliance leadership
Develop specialized BIM and green construction expertise
Build resilient, regulation-aligned supply chains